亚洲伦理一区二区中文字幕,人妻精品一区二区三区久久,国产福利一区二区三区在线视频,日本一区二区三区影视

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
亚洲中文字幕无码一区| 97精品国产综合久久久免费| 欧美国产日韩精品77上位| 国产久久久久久久久一区二区| 日韩亚洲欧美综合在线| 欧美亚洲综合中文字幕蜜桃成熟| 欧美激情国产精品视频| 亚洲区一区二区三区视频| 国产高新无码在线观看| 日产国产精品久久久久久| 97精品国产自产在线观看| 国产真人实拍女处实破| 国产日韩欧美精品小视频| 呻吟丰满一区二区三区| 韩漫漫画在线免费看视频| 成年女人都爱看的毛片| 亚洲国产精品一区二区三区久久| 日韩精品一区二区三区四区| 韩国午夜理伦三级理论电影| 88国产精品视频一区二区三区| 亚洲一区二区三区中文字幕一本| 久久久久无码精品国产app| 欧美色欧美亚洲另类在线视频| 国内精品国产三级国产av万事达| 在线十亚洲十欧美十日本专区| 日本精品最新字幕一区二区| 亚洲视频专区一区二区| 91精品一区二区三区蜜臀| 中文字幕精品资源站| 中文字幕人妻乱一区二区三区| 91精品国自产在线播放| 天天干天天射天天日天天操| 亚洲精中文字幕二区三区| 亚洲av久久一区二区| 亚洲国产精品久久久久麻| 欧美日本aⅴ一区二区三区| 激情小说校园春色亚洲| 91精品一区二区三区蜜臀| 国产永久免费观看的黄网站| 久久久久成人精品免费播放寂寞少妇| 欧美一区二区三区啪啪|