亚洲伦理一区二区中文字幕,人妻精品一区二区三区久久,国产福利一区二区三区在线视频,日本一区二区三区影视

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當(dāng)前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
亚洲精品在线观看日韩电影| 国产精品不卡在线视频| 久久99精品免费免费| 亚洲AV永久无码精品加勒比| av网址在线播放大全| 一区二区三区精品99久久| 丰满少妇爽视频一区二区三区| 欧美精品在线观看不卡| 日韩精品高清在线观看| 亚洲一区二区三区中文字幕一本| 国语自产拍无码精品视频在线| 亚洲国产精品久久久久网站| 亚洲成av一区二区三区| 91久久国产福利自产拍| 国产免费黄色片在线观看| 久久久久久久久久福利高潮| 久久久久久999一区二区三区| 国产高清国内精品福利免费| 国产v片在线免费观看| 日本不卡久久伊人麻豆传媒| 中文亚洲欧美日韩国产| 国产三级在线免费播放| 日韩精品久久理论片| 暗呦交小U女国产精品视频| 91久久国产福利自产拍| 亚洲国产精品国揄产拍| 91精品一区二区三区蜜臀| 九色九九综合久久爱| 国产三级久久久久久久久久| 欧美一区二区三区成| 韩彩英三级无删减视频| 人碰人碰人人97免费搜播| 亚洲欧美日韩国产最新版| 无码人妻视频一区二区三区| 国产麻豆精品福利在线观看| 西野翔人妻中文字幕电影| 国产v亚洲v天堂无码| 日韩推理片电影在线播放| 国产成人欧美日本在线观看| 亚洲人妻一区二区久久| 成人亚洲视频在线观看|